Multi-Period Remanufacturing Planning With Uncertain Quality of Inputs

Show full item record

Please use this identifier to cite or link to this item: http://hdl.handle.net/1853/18986

Title: Multi-Period Remanufacturing Planning With Uncertain Quality of Inputs
Author: Ferguson, Mark E. ; Denizel, Meltem ; Souza, Gilvan C.
Abstract: In this paper we consider production planning of remanufactured products when inputs have different and uncertain quality levels, and there are capacity constraints. This situation is typical of most remanufacturing environments, where inputs are product returns (also called cores). Production (remanufacturing) cost increases as the quality level decreases, and any unused cores may be salvaged at a value that increases with their quality level. Decision variables include, for each period and under a certain probabilistic scenario, the amount of cores to grade, the amount to remanufacture for each quality level and the amount of inventory to carry over for future periods for un-graded cores, graded cores, and finished remanufactured products. Our model is grounded with data collected at a major OEM that also remanufactures. We formulate the problem as a stochastic program, and illustrate how the deterministic version of the problem yields solutions that cannot be implemented in practice. The stochastic program, although a large linear program, can be solved easily using Cplex. We provide a numeric study to generate insights into the nature of the solution.
Type: Working Paper
URI: http://hdl.handle.net/1853/18986
Date: 2008-01-11
Subject: Remanufacturing
Stochastic Programming

Items in SMARTech are protected by copyright, with all rights reserved, unless otherwise indicated.

Files in this item

Files Size Format View
StochProdPlan_v5.2.pdf 255.0Kb PDF View/ Open

This item appears in the following Collection(s)

Show full item record