| Title: | Distribution Center Location and Expansion Plan, Platt Electric Supply |
| Alternative Title: |
Distribution Center Location and Expansion Plan;
Platt Electric Supply - Senior Design Presentation |
| Author: | Cermenaro, Sara ; Duarte, Jonathan ; Vásquez, Julio ; Villegas, Mariana ; Virgil, Taylor ; Willis, Luis |
| Abstract: | The project provided Platt Electric, the largest private wholesale electric supply distributor in the western United States, with different options for the expansion of their business and the addition of 110 branches. Using demand forecasting and robust optimization modeling, the team recommended implementation plans including when and where to locate new distribution centers (DCs), the branch opening schedule, and the branch allocation to the DCs over time. The team's recommendations could save Platt approximately $3.2 million per year over the intended implementation period. |
| Description: |
Presented on December 10, 2008 from 6 to 7:30 pm in the Instructional Center, room 205 on the Georgia Tech campus. Item removed from view at request of Platt Electric Supply. |
| Type: | Presentation |
| URI: | http://hdl.handle.net/1853/27037 |
| Date: | 2008-12-10 |
| Contributor: | Georgia Institute of Technology. School of Industrial and Systems Engineering |
| Publisher: | Georgia Institute of Technology |
| Subject: |
Forecasting
Platt Electric Supply Industrial engineering Optimization Senior design final presentation |
| Advisor: | Shabbir Ahmed |
Items in SMARTech are protected by copyright, with all rights reserved, unless otherwise indicated.
| Files | Size | Format | View |
|---|---|---|---|
|
There are no files associated with this item. |
|||