Distribution Center Location and Expansion Plan, Platt Electric Supply

Show full item record

Please use this identifier to cite or link to this item: http://hdl.handle.net/1853/27037

Title: Distribution Center Location and Expansion Plan, Platt Electric Supply
Alternative Title: Distribution Center Location and Expansion Plan;
Platt Electric Supply - Senior Design Presentation
Author: Cermenaro, Sara ; Duarte, Jonathan ; Vásquez, Julio ; Villegas, Mariana ; Virgil, Taylor ; Willis, Luis
Abstract: The project provided Platt Electric, the largest private wholesale electric supply distributor in the western United States, with different options for the expansion of their business and the addition of 110 branches. Using demand forecasting and robust optimization modeling, the team recommended implementation plans including when and where to locate new distribution centers (DCs), the branch opening schedule, and the branch allocation to the DCs over time. The team's recommendations could save Platt approximately $3.2 million per year over the intended implementation period.
Description: Presented on December 10, 2008 from 6 to 7:30 pm in the Instructional Center, room 205 on the Georgia Tech campus. Item removed from view at request of Platt Electric Supply.
Type: Presentation
URI: http://hdl.handle.net/1853/27037
Date: 2008-12-10
Contributor: Georgia Institute of Technology. School of Industrial and Systems Engineering
Publisher: Georgia Institute of Technology
Subject: Forecasting
Platt Electric Supply
Industrial engineering
Optimization
Senior design final presentation
Advisor: Shabbir Ahmed

Items in SMARTech are protected by copyright, with all rights reserved, unless otherwise indicated.

Files in this item

Items in SMARTech are protected by copyright, with all rights reserved, unless otherwise indicated.

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show full item record