Browsing 1993 Georgia Water Resources Conference by Subject "Waste discharge"
Now showing items 1-1 of 1
-
Adapting the E.P.A. Rapid Bioassessment Protocol for Use Attainability Study in the Cape Fear River
(Georgia Institute of TechnologyInstitute of Natural Resources, 1993-04)Water quality of the lower Cape Fear River below Lock and Dam No. 1 (about 60 km upstream of the City of Wilmington) has long been considered affected by a large number of industrial and municipal waste discharges. However, ...