Search
Now showing items 1-4 of 4
A Clean Lakes Phase I - Diagnostic/Feasibility Study of Lake Allatoona: A Preliminary Report
(Georgia Institute of Technology, 1993-04)
Lake Allatoona is an 11,862 acre impoundment
of the Etowah River in northwest Georgia, lying along the southern tail of the Blue Ridge Mountains, only 30 miles northwest of Atlanta. The impoundment has been designated for ...
Wetlands Planning for the State of Georgia: A Watershed Demonstration Project
(Georgia Institute of Technology, 1993-04)
Among the projects funded by the U.S. Environmental Protection Agency's State Wetland Planning Grant Program, Watershed Demonstration Projects provide the
opportunity to protect water resources through the planning process ...
The Role and Design of Water Quality Monitoring on Forested Watersheds
(Georgia Institute of Technology, 1993-04)
While many point sources of pollution have been ameliorated over the last twenty years, nonpoint sources (NPSs) of pollution remain a serious threat to the nation's water quality (Reilly, 1991). On a national scale, ...
Stream Rehabilitation in a Disturbed Industrial Watershed
(Georgia Institute of Technology, 1993-04)
Since 1988, a 140 acre industrial watershed in Athens, Georgia has been treated with an unusual combination of stormwater and sediment controls. The site had a prior history of sedimentation, channelization,
and altered ...