Burger King® Senior Design Final Presentation

View/ Open
Date
2010-05-05Author
LaPerre, Jennifer
Powers, Matthew
Sears, Jared Trammell
Spicher, Stephen
Sugar, Patrick
Vila, Kristen
Metadata
Show full item recordAbstract
The team addressed three areas of improvement for Burger King®: determining the optimal number of point-of-sale units, eliminating
excessive labor hours, and reducing wait times in the drive-thru. The following three project deliverables were developed: a stochastic
model, a labor scheduling integer program, and a series of simulations. These resulted in a potential cost savings of over $6M annually.
Collections
- ISYE Senior Design [36]