Wind Turbine Offloadng Optimization Strategy

Date
2012-05-02Author
Cantu, Antonio Elosua
Ching Sanchez, Jacmara Katheryn
Harasic-Yaksic, Oscar Andres
Kieffer, Santiago Diaz
Mintz, Yonatan Dov
Nassarwere, Mario Solares
Metadata
Show full item recordAbstract
GE Energy is a leader in the alternative energy field, installing over 16,000 wind turbines since 2002. The team created tools to forecast the times of arrival of components to wind sites and optimize the allocation of offloading cranes. GE Energy can expect savings of 1.9 million from implementation of these tools.
Collections
- ISYE Senior Design [36]