A framework to enable rotorcraft maintenance free operating periods
Abstract
The British Ultra-Reliable Aircraft Pilot Program of the late 1990s introduced the sustainment concept of a Maintenance Free Operating Period (MFOP) where aircraft become fault tolerant, highly reliable systems that minimizes disruptive failures and maintenance for an extended period of operations. After the MFOP, a single Maintenance Recovery Period (MRP) consolidates repair of accrued faults and inspections to restore an aircraft’s reliability for the next MFOP cycle. The U.S. Department of Defense recently adopted MFOP as a maintenance strategy for the next generation of rotorcraft named Future Vertical Lift. The U.S. military desires the assurance of uninterrupted flight operations that an MFOP strategy provides to enable an expeditionary force. This work develops a framework to balance downtime, dependability, and maintainability of an MFOP rotorcraft. It begins with the hypothesis that metrics using the mean are insufficient in a MFOP strategy and that metrics that include the time history of failure are as important as the rate of failure. It will utilize a Discrete Event Simulation to model the MFOP, MRP, and the success rate as operational metrics. The work will identify which subsystem(s) limit the MFOP of an aircraft and which components drive MRP higher. It will explore a framework to build policies for availability and success rate where preventive component renewals occur at discrete multiples of the MFOP. Finally, it will test the hypothesis that an operator has some control over the MFOP to meet changing operational demands by adapting the MRP through an aggressive lifing policy.
Collections
Related items
Showing items related by title, author, creator and subject.
-
Roof Maintenance Record Analysis Toward Proactive Maintenance Policies
Khuncumchoo, Non (Georgia Institute of Technology, 2007-04-04)The objective of this study is to propose an approach that assists facility managers in obtaining the needed information to establish a proactive roof maintenance plan. Two main methodologies are used in this research. ... -
Decay, Maintenance and Repair Symposium - Session One
Irvin, Kate; Weisz, Claire; Widder, Lynnette; Russell, Andrew (Georgia Institute of Technology, 2018-04-13)Kate Irvin - TITLE: "Repair and Design Futures: Lessons from Mended Textiles". This presentation explores the lessons that worldwide practices of mending offer designers today, moving from historic objects, the maker’s ... -
Decay, Maintenance and Repair Symposium - Session Three
Brown, Joe; Frost, David; Usselman, Steve (Georgia Institute of Technology, 2018-04-13)Joe Brown - TITLE: "Reliability and Resilience: Drinking Water Infrastructure in Rural Bangladesh, Ethiopia, Mozambique, and Pakistan". This presentation describes nationalscale surveys of rural drinking water supplies ...